| + | These projects would significantly improve the thin film infrastructure. | ||
| + | |||
| + | ===== Processes ===== | ||
| + | ==== MoGe ==== | ||
| + | It should be possible to sputter MoGe in the ATC. Also Nb Tc should be > 8K. NbN can be better. These issues should be investigated. | ||
| + | |||
| + | ==== Au ==== | ||
| + | Good Au recipes are available in ATC. Check dependence of Au growth on some parameters. Hypothesis of flattening by O2 because of ' | ||
| + | |||
| + | ==== Resist ==== | ||
| + | === Ma-N 24xx === | ||
| + | This process is not working well due to a change in developer concentration. Buy old developer. As a patch an O2 descum process is used to remove resist ' | ||
| + | |||
| + | ==== Etching ==== | ||
| + | RIE etching opens lots of new possibilities. Develop recipes for Nb, NbGe, MoGe, NbN, etc. | ||
| + | |||
| + | === Strip (glass) === | ||
| + | Stripping of resists is problematic due to the absence of a 'bain Marie' | ||
| + | |||
| + | ==== Thickness data ==== | ||
| + | Enter measured thicknesses immediately in wiki. | ||
| + | |||
| + | ==== Computers (sysadmin / meas. sysadmin) ==== | ||
| + | msm09 should be centrally administrated. Access from outside to some parts would be handy. There' | ||
| + | |||
| + | ===== Equipment ===== | ||
| + | |||
| + | ==== ATC sputtering system ==== | ||
| + | === Temperature control (electronics, | ||
| + | For epitaxial Au growth it is beneficial to have a well defined pretreatment (degassing) of the mica and controlled cooldown. Temp controller does not provide this internally but is remote controllable by 0-10V signals. A National Instruments usb6008 USB DAQ module is available. Maybe signals have to be scaled with an opamp, this can possibly avoided. Code needs to be written so that a temp profile can be programmed. Labview would be good, can it run on the Dell PC that is available for this? | ||
| + | |||
| + | ==== Oxide sputtering system ==== | ||
| + | === Datalogger (electronics, | ||
| + | The oxide sputtering system has a control system that contains an 8 input datalogger. Now, 3 channels are used. Wiring for these 3 channels should be improved by making converter cables to BNC. 1 more pressure gauge can be logged, a converter cable must be made. The 4 remaining channels can log voltage and current of 2 power supplies. Check signal levels before connecting. | ||
| + | |||
| + | === Automated heater rotation (mechanics, electronics, | ||
| + | Drive the heater feedthrough by a belt (buy/ | ||
| + | |||
| + | === Cooling water (mechanical, | ||
| + | Buy 2 turbine flowmeters to interlock the sources. Use a leftover rotameter to protect cooling spiral. Machine a panel for the 'old PC hole' in the 19" rack (paint black), mount turbine meters there visibly. 18 MOhm trip relay (floor water sensor) does not work. Wiring or relay? There is a spare relay. Fix. Connect relay also to water sensor in feedthrough. Interlock heater. | ||
| + | |||
| + | ==== Z-400 sputtering system ==== | ||
| + | === Rotation (mechanical) === | ||
| + | Automate knob to sputter w. interrupts more reproducably / less annoying. Software available. Buy (very strong) steppermotor + controller. Measure required torque first (>10 Nm). | ||
| + | |||
| + | ==== UHV sputtering system ==== | ||
| + | === Automation (mechanics, electro, software) === | ||
| + | Buy damped pneumatics for shutters. Interface AE supplies to PC. Build shutter (design sketch available). Mount steppermotor (already bought). Develop software to automate everything. | ||
| + | |||
| + | ==== K-cell evaporator ==== | ||
| + | === Software === | ||
| + | New and improved Eurotherm software is available, should be installed. | ||
| + | |||
| + | ==== Resistance evaporator ==== | ||
| + | === X-tal === | ||
| + | Install better thickness monitor. | ||
| + | |||
| + | === Shadow evaporation (mechanical) === | ||
| + | Buy parts / build parts to enable sample transfer / tilt / rotation in tili plane / heating | ||
| + | |||
| + | === E-gun === | ||
| + | Mount e-gun in bolt-on chamber (expensive, not urgent) | ||
| + | |||
| + | === Transfer (mechanics) === | ||
| + | Build a better loadlock and transfer system, allowing shadow evaporation. Expensive. | ||
| + | |||
| + | ==== IBE etcher ==== | ||
| + | === Safety issue (mechanical) URGENT === | ||
| + | Frame should be mounted to floor or wall. According to the manual of the turbo the 1600 liter pump with several 10's of kg of spinning mass generates a torque of 4500 nm when crashing. Extra brackets to mount vacuum chamber on frame should be built. | ||
| + | |||
| + | ==== RIE etcher ==== | ||
| + | === Exhaust (mechanical) === | ||
| + | The etch gases should be injected in the exhaust, as far as possible downstream, with a reliably mounted construction. | ||
| + | N2 flush should be connected to each stage of the 2 stage rotary pumps. Pressure? Flow: stay below LEL, reccomendations from Leybold? | ||
| + | |||
| + | === Process temperature control (electronics) URGENT === | ||
| + | Right now there is no ' | ||
| + | |||
| + | The RIE etcher sends a 0-10V signal to a chiller connection and expects a 0-10V signal back, these signals correspond linearly to a temperature (1V=0C, 10V=90C) (right now the output voltage is looped back to the input, resulting in ' | ||
| + | |||
| + | === Safety system (Chlorine only) === | ||
| + | Mount Cl sensors (www.draeger.com) in cleanroom, 611 and in ventilation system. Install trip level relays (for critical applications, | ||
| + | - if power down: close Cl2 valve, switch off etcher via PL7 interlock (2 normally open relay contacts) | ||
| + | - if fire in 611: close Cl2 valve, switch off etcher via PL7 interlock | ||
| + | - if flow < 10m3/h (that' | ||
| + | - if Cl2 > 1ppm in a room or 3.5 ppm in line: close Cl2 valve, switch off etcher via PL7 interlock | ||
| + | - if Cl2 > 15 ppm page fire brigade | ||
| + | - if Cl2 > 50 ppm in a room: trigger fire alarm, evacuate HL | ||
| + | |||
| + | ==== E-beam ==== | ||
| + | === Beam stabilizer (mainly software) === | ||
| + | The beam stabilizer electronics works fine but the software does not work with patterns that regularly blank the beam and has a long built-in time delay after a stage move that makes it not work for some job lists. It also appears that the regulation parameters are valid only in a part of the range. After a stage move (regulation has been off) the accumulated error should be eliminated rapidly, now it takes 40 sec before anything happens. Above issues result in sample loss, sometimes after a lot of processing. Perhaps we should replace the programmable AD/DA chip with an old PC, install linux and connect it to a [[http:// | ||
| + | |||
| + | The regulator should employ adaptive control. This can be simple because when the gun alignment is adjusted properly (and this is normally done before writing) the current should increase monotonically with potentiometer setting/ | ||
| + | |||
| + | Larger errors can be corrected with 2 or 3 iterations of Newton' | ||
| + | |||
| + | === Stage (mechatronics, | ||
| + | The motor stage of the e-beam has an accuracy of 1 um after a move, several um accumulated after many moves. Accurate stage movement in closed loop would greatly improve alignments. A piezo substage with laser interferometers for x and y would accomplish this. See i.e. [[http:// | ||
| + | |||
| + | ===== Wishlist ===== | ||
| + | The following equipment would make sample fabrication much easier and efficient: | ||
| + | * Good optical microscope for cleanroom (with CCD) | ||
| + | * Profilometer (veeco dektak, alphastep etc.) (can be combined with above) | ||
| + | We could look for a used profilometer that's still in a good state. | ||