 ====== Manual ====== ====== Manual ======
 +===== Start up & Loading sample =====
 +  * Open N2 line at the wall 1/2 turn (check pressure reducer)
 +  * Open Ar bottle and the in-line valve in the yellow cabinet
 +  * Check if the required target material is in 
 +  * If system is vented, insert your sample and close the top
 +  * Switch on system mains (green switch)
 +  * Switch on chiller (below the table)
 +
 ===== Sputtering ===== ===== Sputtering =====
-  * open N2 valve at wall 1/2 turn +  * Purge the argon line by opening the needle valve and repeatedly opening and closing the argon valve at the bottle 
-  * insert sample, close chamber, open target knob on top of chamber +  * Carefully close the needle valve to pump down 
-  * switch on (green switch), this starts prepump +  * Switch turbo on at 1e-1 mbar by pressing "pumping unit" and "stand by" on the turbo controller  
-  * open Ar bottle and little valve +  * Adjust pressure using needle valve to 5E-2mbar 
-  * purge 2-3x with argon (e.g., at 1E-1mbar open&close needle valve) +  * Set current dial knob to 0 and switch to "HTS" 
-  * if sputtering longer than 1min, switch chiller on (~18deg) +  * Select sputtering time and press start 
-  * switch turbo on at 1E-1mbar: activate "pumping unit" and "stand by"  +  * Adjust current dial for desired current (lower-righ indicator!) 
-  * adjust pressure using needle valve to 5E-2mbar +  * Wait 
-  * switch big dial knob to 0, set to "HTS" +  * Switch turbo pump off 
-  * select sputtering time and press start +  * If turbo stands still, switch off machine (green button), automatic N2 purging starts 
-  * adjust big dial for desired current (lower-righ indicator!) +  * Close Ar, N2 supply ; switch off chiller
-  * wait +
-  * switch turbo pump off +
-  * if turbo stands still, switch off machine (green button), automatic N2 purging starts +
-  * close Ar, N2 supply ; switch off chiller+
  
  
Line 36: Line 40:
 | Ag (?)               | 20110623 | SEM of SU-8    | 5E-2 mbar, 15 mA, 15s | SEM pic     | nice      |         | | Ag (?)               | 20110623 | SEM of SU-8    | 5E-2 mbar, 15 mA, 15s | SEM pic     | nice      |         |
  
 +====== bugs ======
 +===== yellow HV light does not go on =====
 +Don't do this because of high voltage in the machine!
  
 +{{:balzer-med010-relay.jpg?700|}}